Project — Public Infrastructure
Ekra Decor’s archive separately records a tensile structure for “Swara Enterprises, care of PR Patil and company, near Gandhi Samara, Daman and Diu,” completed in 45 days for a 20,304 sq ft area.
Project Overview
Ekra Decor’s archive separately records a tensile structure for “Swara Enterprises, care of PR Patil and company, near Gandhi Samara, Daman and Diu,” completed in 45 days for a 20,304 sq ft area.
The archive photograph shows a tensile pavilion on a landscaped seafront promenade with bougainvillea flowerbeds, overlooking the sea, with what appears to be a memorial structure visible in the distance.
Project Information
Project Highlights
Unlike the merged Swara Enterprises/Food Court page, this entry names a care-of contact (PR Patil) and a nearby landmark (Gandhi Samara), suggesting it documents a genuinely different site or phase.
The photograph shows a landscaped coastal walkway with flowerbeds, consistent with a public promenade development rather than a commercial food court.
Per Ekra Decor’s project records, the structure was completed in roughly 45 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Ekra Decor's project records describe this installation as a seafront promenade tensile pavilion.
Near Gandhi Samara, Daman and Diu.
≈1,886 m² (20,304 sq ft), per Ekra Decor's project records.
≈45 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Swara Enterprises (c/o PR Patil and company).
Yes — 1 photograph from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited