Ekra Decor’s company archive records a large tensile structure for Siemens Ltd. in Goa, covering 20,000 m² — by far the largest area figure in the company’s project catalogue.
Project Overview
Ekra Decor’s company archive records a large tensile structure for Siemens Ltd. in Goa, covering 20,000 m² — by far the largest area figure in the company’s project catalogue.
Siemens operates major switchgear and low/medium-voltage manufacturing plants at Verna Industrial Estate, Goa, and has invested over ₹1,000 crore expanding operations there in recent years.
Project Information
Photographs From the Archive
Project Highlights
At 20,000 m², this is the single biggest project figure in the company’s own project catalogue, consistent with covering yard or logistics space at a large industrial plant. Photographs are held in Ekra Decor’s company archive and published on this page.
A structure at this scale would need to be installed around a working factory site without disrupting production.
Per Ekra Decor’s project records, the structure was completed in roughly two months.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Goa (Verna Industrial Estate area).
20,000 m², per Ekra Decor's project records.
≈2 months from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Siemens Ltd..
Yes — 6 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited