Direct Hotline: +91 98102 37952
Rangpuri Near Shiv Murti, NH-8, New Delhi
ISO 9001:2015 Certified Manufacturer

Project — Airports & Transit

IGI Airport, Terminal 2, Delhi Entrance Canopy

Ekra Decor supplied a cantilevered tensile fabric canopy over the vehicle drop-off in front of Terminal 2 at Indira Gandhi International Airport, New Delhi.

  • LocationNew Delhi
  • Structure TypeVehicle drop-off entrance canopy
  • Photographs5, this archive
IGI Airport Terminal 2 Delhi entrance tensile canopy by Ekra Decor, Domestic Terminal 2 signage visible

Project Overview

5archive photographs
from Ekra Decor’s
project records

Ekra Decor supplied a cantilevered tensile fabric canopy over the vehicle drop-off in front of Terminal 2 at Indira Gandhi International Airport, New Delhi.

The “Domestic Terminal 2” signage visible in Ekra Decor’s own site photograph is the clearest evidence tying this specific canopy to that terminal building.

Project Information

ClientDelhi International Airport (Terminal 2)
LocationIGI Airport, Terminal 2, New Delhi
Structure typeVehicle drop-off entrance canopy
Area1,800 m²
CompletionNot on record
Photographs5, this archive
02Archive photograph 2
03Archive photograph 3
04Archive photograph 4
05Archive photograph 5

Project Highlights

Curbside weather cover

Shelters passengers and vehicles queuing at the terminal frontage from sun and monsoon rain.

Column-free at the kerb

A cantilevered frame keeps the canopy clear of the drop-off lane so cars and taxis can pull directly underneath.

Built around live operations

Installing an airport-frontage canopy has to work around continuous passenger and traffic flow.

How This Project Was Delivered

A turnkey process, start to finish

Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.

  1. 01

    3D design & form finding

    Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.

  2. 02

    Structural engineering

    Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.

  3. 03

    In-house fabrication

    Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.

  4. 04

    Site installation

    The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.

Credentials

Ekra Decor ISO 9001:2015 certificate of registration View full certificate →
ISO 9001:2015
305026042050Q
Certified scope
Manufacturing of Tensile Structures and Membranes
Valid to
19 April 2029
GSTIN
07AADCE1244L1ZQ
Udyam
UDYAM-DL-10-0012798
IEC
AADCE1244L
Established
1998

Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.

Common Questions

About This Project

What type of structure is this?

Ekra Decor's project records describe this installation as a vehicle drop-off entrance canopy.

Where is this project located?

IGI Airport, Terminal 2, New Delhi.

How large is the covered area?

1,800 m², per Ekra Decor's project records.

Who was this project built for?

Delhi International Airport (Terminal 2).

Are there real photographs of this project?

Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.

Can Ekra Decor build something similar for my site?

Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.

Have a Similar Project in Mind?

Let’s discuss the right architectural and structural solution for your space.

Trusted By

Organisations we have built for

Call Now WhatsApp Email Us
WhatsApp Call Now