Project — Industrial & Manufacturing
Ekra Decor’s archive records a tensile structure for Siemens Ltd. in Mumbai, completed in 50 days for a 15,000 sq ft area — a separate entry from the company’s Siemens, Goa project published elsewhere on this site.
Project Overview
Ekra Decor’s archive records a tensile structure for Siemens Ltd. in Mumbai, completed in 50 days for a 15,000 sq ft area — a separate entry from the company’s Siemens, Goa project published elsewhere on this site.
Siemens operates real manufacturing and office facilities in the Mumbai region, including its documented Kalwa Works.
Project Information
Photographs From the Archive
Project Highlights
Photographs for this project are held in Ekra Decor’s company archive and published on this page.
This is a separate archive line item (15,000 sq ft/50 days) from the Siemens Goa project (2,560 sq m/60 days), not a duplicate.
Siemens’ Mumbai-area presence, including its Kalwa Works, is documented elsewhere in Ekra Decor’s own client list and independently.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Mumbai, Maharashtra.
≈1,394 m² (15,000 sq ft), per Ekra Decor's project records.
≈50 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Siemens Ltd..
Yes — 4 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited