Project — Public Infrastructure
Ekra Decor’s archive records a tensile structure at Diu, completed in 40 days for a 2,200 m² area — a separate, smaller entry from the company’s merged Swara Enterprises/Food Court page (5,000 m²) and the Swara Enterprises (PR Patil) entry (≈1,886 m²), both also in Diu.
Project Overview
Ekra Decor’s archive records a tensile structure at Diu, completed in 40 days for a 2,200 m² area — a separate, smaller entry from the company’s merged Swara Enterprises/Food Court page (5,000 m²) and the Swara Enterprises (PR Patil) entry (≈1,886 m²), both also in Diu.
The archive photographs show a conical tensile pavilion over a round base building, plus a separate double-peak canopy elsewhere on the same site.
Project Information
Photographs From the Archive
Project Highlights
Ekra Decor’s combined archive names at least three separate Diu entries at different scales (2,200 m² here, 5,000 m² for Swara Enterprises/Food Court, ≈1,886 m² for the PR Patil variant) — kept distinct rather than merged, since none of the figures match closely enough to be confident they are duplicates.
The photograph shows landscaping work in progress around a conical tensile pavilion, consistent with a coastal Diu development.
Per Ekra Decor’s project records, the structure was completed in roughly 40 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Ekra Decor's project records describe this installation as a conical tensile pavilion.
Diu.
2,200 m², per Ekra Decor's project records.
≈40 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Yes — 6 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited