Project — Commercial & Institutional
Ekra Decor installed a barrel-vault tensile ceiling over an interior office floor for a managed-workspace fit-out in Noida, recorded in the company’s archive as “Smartwork Noida”.
Project Overview
Ekra Decor installed a barrel-vault tensile ceiling over an interior office floor for a managed-workspace fit-out in Noida, recorded in the company’s archive as “Smartwork Noida”.
The archive photograph shows the roof mid-fit-out, with a steel walkway truss suspended below the membrane and partitioned rooms still under construction beneath it.
Project Information
Photographs From the Archive
Project Highlights
A tensioned membrane ceiling brings diffuse natural light into a deep office floorplate.
The canopy sits inside the building envelope, integrated with the workspace fit-out below rather than as an outdoor structure.
Per Ekra Decor’s records, the installation was completed in around 35 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Ekra Decor's project records describe this installation as a interior office-floor tensile ceiling.
Noida, Uttar Pradesh (sector not specified).
1,800 m², per Ekra Decor's project records.
≈35 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
“Smartwork Noida” (unconfirmed).
Yes — 6 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited