Project — Commercial & Institutional
Ekra Decor’s company presentation records a tensile structure at Rajnagar, Ghaziabad, completed in 55 days for a 3,000 m² area.
Project Overview
Ekra Decor’s company presentation records a tensile structure at Rajnagar, Ghaziabad, completed in 55 days for a 3,000 m² area.
This is a separate, smaller project from the company’s later KW Delhi 6 development at nearby Raj Nagar Extension (an 8,000 m² project, documented on its own page) — the two are easily conflated given the shared area name, but the figures, and the absence of any KW Group or Delhi-6 branding in this photograph, indicate they are different installations.
Project Information
Photographs From the Archive
Project Highlights
Despite sharing the ‘Raj Nagar’ area name with the later KW Delhi 6 development, the area (3,000 m² vs 8,000 m²) and the photograph itself do not match — treated here as two separate projects.
The barrel-vault canopy covers a substantial retail or commercial frontage.
Per Ekra Decor’s project records, the structure was completed in roughly 55 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Raj Nagar, Ghaziabad, Uttar Pradesh.
3,000 m², per Ekra Decor's project records.
≈55 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited