Project — Commercial & Institutional
Ekra Decor’s archive records a tensile structure for “K W Homes Pvt Ltd, Ghaziabad”, matching KW Delhi 6, a commercial development by the Delhi-NCR real-estate developer KW Group at Raj Nagar Extension, Ghaziabad, offering retail stores, a food court and a gaming zone.
Project Overview
Ekra Decor’s archive records a tensile structure for “K W Homes Pvt Ltd, Ghaziabad”, matching KW Delhi 6, a commercial development by the Delhi-NCR real-estate developer KW Group at Raj Nagar Extension, Ghaziabad, offering retail stores, a food court and a gaming zone.
Project Information
Photographs From the Archive
Project Highlights
At 8,000 m², this ties with Vikram Solar Kolkata’s larger figure as one of the biggest projects in Ekra Decor’s catalogue.
KW Delhi 6’s documented food court and retail zones are the kind of space that commonly gets a tensile roof for daylight and weather cover.
At 4.5 months, this is one of the longer completion times in Ekra Decor’s archive, consistent with the larger area.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Raj Nagar Extension, Ghaziabad, Uttar Pradesh.
8,000 m², per Ekra Decor's project records.
≈4.5 months from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
K W Homes Pvt. Ltd. (KW Group, likely the KW Delhi 6 development).
Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited