Direct Hotline: +91 98102 37952
Rangpuri Near Shiv Murti, NH-8, New Delhi
ISO 9001:2015 Certified Manufacturer

Project — Hospitality

Landmark, Nepal Tensile Structure

Ekra Decor’s archive records a tensile structure for a “Landmark Hotel” in Nepal, completed in 1.5 months for a 10,000 sq ft area.

  • LocationNepal (city not specified)
  • Structure TypeNot on record
  • Photographs1, this archive
Landmark Nepal covered retail arcade tensile canopy, photograph from Ekra Decor's company presentation

Project Overview

1archive photograph
from Ekra Decor’s
project records

Ekra Decor’s archive records a tensile structure for a “Landmark Hotel” in Nepal, completed in 1.5 months for a 10,000 sq ft area.

The archive photograph shows a covered retail/market arcade with storefront signage including a partially legible “CG Landmark” sign, consistent with the “Landmark” branding in the project’s name, though the space shown looks like a shopping arcade rather than a hotel building specifically.

Project Information

Client“Landmark Hotel” (Nepal — exact property/city not specified)
LocationNepal
Structure typeNot on record
Area≈929 m² (10,000 sq ft)
Completion≈1.5 months
Photographs1, this archive

Project Highlights

Signage partially confirms the name

A visible “CG Landmark” sign in the photograph corroborates the project’s “Landmark” branding, though it does not confirm the property is specifically a hotel.

Retail arcade format

The photograph shows a covered shopping arcade with multiple storefronts rather than a hotel building itself.

Delivered in about 1.5 months

Per Ekra Decor’s project records, the structure was completed in roughly 1.5 months.

How This Project Was Delivered

A turnkey process, start to finish

Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.

  1. 01

    3D design & form finding

    Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.

  2. 02

    Structural engineering

    Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.

  3. 03

    In-house fabrication

    Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.

  4. 04

    Site installation

    The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.

Credentials

Ekra Decor ISO 9001:2015 certificate of registration View full certificate →
ISO 9001:2015
305026042050Q
Certified scope
Manufacturing of Tensile Structures and Membranes
Valid to
19 April 2029
GSTIN
07AADCE1244L1ZQ
Udyam
UDYAM-DL-10-0012798
IEC
AADCE1244L
Established
1998

Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.

Common Questions

About This Project

Where is this project located?

Nepal.

How large is the covered area?

≈929 m² (10,000 sq ft), per Ekra Decor's project records.

How long did this project take to build?

≈1.5 months from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.

Who was this project built for?

“Landmark Hotel” (Nepal — exact property/city not specified).

Are there real photographs of this project?

Yes — 1 photograph from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.

Can Ekra Decor build something similar for my site?

Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.

Have a Similar Project in Mind?

Let’s discuss the right architectural and structural solution for your space.

Trusted By

Organisations we have built for

Call Now WhatsApp Email Us
WhatsApp Call Now