Project — Hospitality
Ekra Decor’s archive records a tensile structure at Golden Event Palace, a real banquet and event venue in Moradabad, Uttar Pradesh with two indoor banquet halls (10,000 sq ft and 5,000 sq ft) according to the venue’s own website.
Project Overview
Ekra Decor’s archive records a tensile structure at Golden Event Palace, a real banquet and event venue in Moradabad, Uttar Pradesh with two indoor banquet halls (10,000 sq ft and 5,000 sq ft) according to the venue’s own website.
The archive photograph clearly shows the venue’s illuminated “GOLDEN PALACE” signage and an attached “BBQ Station” at night, confirming the location.
Project Information
Project Highlights
The photograph shows illuminated “GOLDEN PALACE” and “BBQ Station” signage matching the venue’s real branding precisely.
At 400 m², this tensile structure is much smaller than the venue’s documented 10,000 and 5,000 sq ft indoor banquet halls, suggesting it covers an outdoor terrace or entrance feature rather than a main hall.
Per Ekra Decor’s project records, the structure was completed in roughly 30 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Moradabad, Uttar Pradesh.
400 m², per Ekra Decor's project records.
≈30 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Golden Event Palace.
Yes — 1 photograph from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited