Project — Education
Ekra Decor’s archive records a tensile structure for Gyan Bharti School, a private co-educational school founded in 1980 on a 7.2-acre campus in Saket, South Delhi, with facilities including a cricket pitch, football field, running track, basketball court and open-air amphitheatre.
Project Overview
Ekra Decor’s archive records a tensile structure for Gyan Bharti School, a private co-educational school founded in 1980 on a 7.2-acre campus in Saket, South Delhi, with facilities including a cricket pitch, football field, running track, basketball court and open-air amphitheatre.
Project Information
Photographs From the Archive
Project Highlights
This is one of the specific projects flagged in the original research brief as having disputed dimensions across Ekra Decor’s own archive; only one figure could be located this session.
Gyan Bharti’s documented open-air amphitheatre and multiple sports fields are plausible matches for a structure of this scale.
Per the one figure located in Ekra Decor’s project records, the structure was completed in roughly 45 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Saket, New Delhi.
1,550 m² (flagged as a known conflicting-data case; only one figure located), per Ekra Decor's project records.
≈45 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Gyan Bharti School.
Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited