Project — Education
Ekra Decor’s archive separately records a second, smaller tensile structure for G.D.
Project Overview
Ekra Decor’s archive separately records a second, smaller tensile structure for G.D.
Goenka Public School, Rudrapur, at 255 m² — distinct from the 558 m² structure recorded elsewhere in the same archive. Both entries name the same school and city but give different areas and completion times, most plausibly reflecting two separate structures on the school’s courtyard-based campus rather than a duplicate record.
Project Information
Photographs From the Archive
Project Highlights
At 255 m², this is less than half the size of the other Rudrapur entry, consistent with a walkway or single-court cover rather than the campus’s main open-air theatre.
Because the two Rudrapur entries have different areas and completion times, they are treated here as two distinct structures rather than merged into one record.
Per Ekra Decor’s project records, the structure was completed in roughly 30 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Rudrapur, Uttarakhand.
255 m², per Ekra Decor's project records.
≈30 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
G.D. Goenka Public School, Rudrapur.
Yes — 4 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited