Project — Education
Ekra Decor’s archive records a tensile structure over a student waiting/circulation area at Allen Career Institute, Kota — one of India’s largest and most prominent JEE/NEET coaching institutes, with 14+ branches across the city.
Project Overview
Ekra Decor’s archive records a tensile structure over a student waiting/circulation area at Allen Career Institute, Kota — one of India’s largest and most prominent JEE/NEET coaching institutes, with 14+ branches across the city.
The archive photograph shows students with backpacks walking through a covered walkway past a banner advertising the institute’s all-India rank results, confirming the setting.
Project Information
Photographs From the Archive
Project Highlights
A banner with rank-results marketing copy, visible in the photograph, is consistent with Allen’s well-documented all-India-rank advertising style.
At 20,000 sq ft, this is one of the larger structures in Ekra Decor’s archive, consistent with covering a walkway or waiting area used by large numbers of students.
Per Ekra Decor’s project records, the structure was completed in roughly 35 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Ekra Decor's project records describe this installation as a student waiting-area / walkway tensile canopy.
Kota, Rajasthan (specific campus not specified).
≈1,858 m² (20,000 sq ft), per Ekra Decor's project records.
≈35 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Allen Career Institute.
Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
TATA Motors
L&T
Reliance
Adani
Versaid
Mahindra
Godrej
DLF
ITC Ltd
Maruti Suzuki
GMR Group
JSW Steel
Prestige Group
Sobha
Siemens
Tata Chemicals
Tata Tele Business Services
Power Grid Corporation
Emaar MGF
National Law University Delhi
UPES Dehradun
Vasant Valley School
Aditya Birla Group
Amity University
Vikram Solar
Tractors India
Mazda Colours
Millennium Structurals
Sehwag International School
BSBK Pvt. Ltd.
17 Miles Hotel
Rich Harvest School
The Imperial New Delhi
Moore Constructions
Mehra Construction
Ramprastha
Minda NexGenTech (UNO Minda)
Yashmay Public School
Gyan Mandir Foundation
Omega Developers