Ekra Decor’s archive records a tensile structure at Silchar Airport, the fourth-busiest airport in Northeast India, operating a single integrated terminal for domestic and limited international flights from a compact 36.7-acre site shared with the Indian Air Force.
Project Overview
Ekra Decor’s archive records a tensile structure at Silchar Airport, the fourth-busiest airport in Northeast India, operating a single integrated terminal for domestic and limited international flights from a compact 36.7-acre site shared with the Indian Air Force.
Project Information
Photographs From the Archive
Project Highlights
The same 93-page document gives two different area figures for this project — a direct, first-hand conflict rather than one inferred from separate sources.
Silchar’s terminal covers a modest, single-integrated-building footprint, consistent with a canopy in the 1,500–1,800 m² range rather than a major hub installation.
The 1,500 m² mention in Ekra Decor’s records gives a completion time of roughly 2 months; no reliable duration could be extracted for the 1,800 m² mention.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Silchar, Assam.
1,500 m² or 1,800 m² (archive conflict, same source document), per Ekra Decor's project records.
≈2 months (single-source figure) from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Silchar Airport / Airports Authority of India (not named directly in archive).
Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited