Project — Industrial & Manufacturing
Ekra Decor’s archive records a tensile structure for Minda Gentex Ltd. at Manesar.
Project Overview
Ekra Decor’s archive records a tensile structure for Minda Gentex Ltd. at Manesar.
Minda Gentex is a joint venture between Uno Minda (a major Indian automotive components group headquartered at IMT Manesar) and Gentex Corporation, producing electrochromic mirrors for vehicles; Uno Minda’s group headquarters and multiple plants are documented at IMT Manesar, Gurugram.
Ekra Decor has not published a photograph confirmed to belong to this specific project. Rather than use a stock, AI-generated, or another project’s photograph, this page is published without a gallery image. This will be updated if a photograph becomes available.
Project Information
Project Highlights
Ekra Decor’s records separately list “Minda Gentex Ltd” and “Minda Projects Ltd” with different areas, suggesting either two different Minda group plants or two references to related facilities.
At 600 m², this is a compact project, consistent with a single walkway or entrance canopy at an automotive components plant.
Per Ekra Decor’s project records, the structure was completed in roughly 30 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
IMT Manesar, Gurugram, Haryana (inferred).
600 m², per Ekra Decor's project records.
≈30 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Minda Gentex Ltd..
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited