Project — Healthcare
Ekra Decor’s company archive records a tensile structure delivered for the Institute of Liver and Biliary Sciences (ILBS), a government super-specialty liver-care hospital and deemed university on Vasant Kunj Road, New Delhi, established in 2009.
Project Overview
Ekra Decor’s company archive records a tensile structure delivered for the Institute of Liver and Biliary Sciences (ILBS), a government super-specialty liver-care hospital and deemed university on Vasant Kunj Road, New Delhi, established in 2009.
ILBS operates a 549-bed campus with a 24x7 emergency department — a large, continuously operating site of the kind that typically needs weather-protected outdoor walkways and gathering areas.
Project Information
Photographs From the Archive
Project Highlights
Installation on an operating super-specialty hospital site has to work around patient access, ambulances and continuous 24x7 operations.
A tensile roof at this scale typically covers a walkway, entrance or gathering area rather than a single small canopy.
Per Ekra Decor’s project records, the structure was completed in roughly 40 days.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Vasant Kunj Road, New Delhi.
2,250 m², per Ekra Decor's project records.
≈40 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Institute of Liver and Biliary Sciences (ILBS).
Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited