Project — Commercial & Institutional
Ekra Decor’s archive records a small tensile structure for Dhoot Infrastructure in Gurgaon.
Project Overview
Ekra Decor’s archive records a small tensile structure for Dhoot Infrastructure in Gurgaon.
Dhoot Infrastructure Projects Limited is the real-estate arm of the Dhoot Group, a diversified Indian conglomerate founded in 1971 with a documented Gurgaon-based real-estate portfolio spanning luxury apartments, farm estates, hotels, malls and IT parks totalling around 5 million sq ft of built-up area.
Project Information
Photographs From the Archive
Project Highlights
At 400 sq ft (about 37 m²), this is among the smallest structures in Ekra Decor’s entire catalogue — likely a single entrance canopy rather than a large roof.
At 10 days, this is one of the shortest completion times recorded anywhere in Ekra Decor’s archive.
Dhoot Group has multiple Gurgaon developments (including Dhoot The Esplanade and Dhoot Time Residency); the archive does not specify which one this structure was built for.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Gurgaon, Haryana (specific property not stated).
≈37 m² (400 sq ft), per Ekra Decor's project records.
≈10 days from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Dhoot Infrastructure Projects Ltd..
Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited