Project — Sports & Recreation
Ekra Decor’s archive records a tensile structure for Champions Aquatics Academy (CAA) at HL City, Bahadurgarh — a real, independently confirmed competitive-swimming academy with Olympic-sized, heated pools that has hosted the Haryana State Swimming Championship.
Project Overview
Ekra Decor’s archive records a tensile structure for Champions Aquatics Academy (CAA) at HL City, Bahadurgarh — a real, independently confirmed competitive-swimming academy with Olympic-sized, heated pools that has hosted the Haryana State Swimming Championship.
The archive photograph shows a barrel-vault canopy over a pool deck under construction, with spectator stands visible.
Project Information
Photographs From the Archive
Project Highlights
CAA’s Bahadurgarh location is documented as hosting the Haryana State Swimming Championship, consistent with the spectator stands visible in the archive photograph.
A barrel-vault tensile roof over a swimming deck provides shade and weather protection for year-round training.
Per Ekra Decor’s project records, the structure was completed in roughly 2 months.
How This Project Was Delivered
Ekra Decor is a turnkey manufacturer — the same team carries a project from first sketch to final tensioning.
Membrane geometry is developed in form-finding software so the fabric is correctly pre-stressed in double curvature.
Steel frame, cables and foundations are engineered for the span, wind and loading conditions of the site.
Steel is fabricated and hot-dip galvanised or epoxy coated; the membrane is patterned and welded in-house.
The frame is erected and the membrane tensioned on site by our own installation crews, then handed over.
Membranes We Work With
The right membrane depends on span, climate and intended lifespan. These are the architectural fabrics we build with.
Credentials
View full certificate →
Issued by QRO (Quality Research Organization). Registered office: No. 367 Badam Singh Market, Rangpuri, Near Shiv Murti, NH-8, New Delhi 110037.
Common Questions
Ekra Decor's project records describe this installation as a swimming pool tensile roof.
HL City, Bahadurgarh, Haryana.
≈204 m² (2,200 sq ft), per Ekra Decor's project records.
≈2 months from start to finish, per Ekra Decor's project records — in line with the standard 10 to 15 day fabrication and 3 to 7 day on-site installation timeline used across most projects.
Champions Aquatics Academy (CAA).
Yes — 5 photographs from Ekra Decor's own project archive appear in the gallery above, not a stock or illustrative image.
Yes — every project starts with a site survey and a custom 3D design tailored to your space, not a fixed template. Get in touch to discuss a similar structure for your own site.
Let’s discuss the right architectural and structural solution for your space.
Trusted By
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited
DLF
Godrej
Larsen & Toubro
Tata
Mahindra
JSW Steel
Adani Power
Aditya Birla Group
Emaar
GMR Group
Amity University
ITC Limited